CAE Datamine.NPV.Scheduler.v4.29.46.0
NPV Scheduler
Complete Strategic Mine Planning System
A complete strategic open pit mine planning system – NPV Scheduler has functionalities spanning everything from pit optimisation, pushback generation, cut-off grade optimisation, scheduling, haulage optimisation and stockpile management. The advanced system caters for alternative techniques beyond NPV for pit optimisation to take account of material blending requirements or to maximise mine life. The innovative pushback generator delivers the most practical pushbacks of any competing product and the scheduling capability includes optimisation techniques that look ahead to the entire life of the mine as opposed to considering just one period at a time.
Product:CAE Datamine.NPV.Scheduler.v4.29.46.0
Lanaguage:english
Platform:Win7/WIN10
Size:1CD
Related articles
- Klau Geomatics KlauPPK Post Processing for DJI RTK Drones v1.19
- SolidCAM 2022 SP3 HF1 Multilang for SolidWorks 2018-2023
- Chaos Enscape 3D 3.5 for Sketchup 2023
- Autodesk Coordinates Transformation Tool 2023
- Autodesk Inventor Professional 2024
- Autodesk AutoCAD Map 3D 2024
- DS SIMULIA CST STUDIO SUITE 2023.03 SP3
- BUB-AGEMA.TDT2.THERMODYNAMICS.DESIGN.TOOL.2021.V2.14